Integrated electrical works at the new factory in Gebze TOSB.

Lighting and electrical installation work from a platform inside a factory
Autoliv Cankor Otomotiv Emniyet Sistemleri
PROJECT DETAILS
Client
Autoliv Cankor Otomotiv Emniyet Sistemleri
Sector
Industrial
Status
Completed
Transformer capacity
3 × 2500 kVA
Location
Gebze TOSB
ABOUT THE PROJECT

Tailored to the need,
proven on site.

Covering the factory's power distribution, security and control needs, the project's transformer, power and low-current works are listed together in the catalogue.

Scope of work

  • MV transformer and LV installation
  • Busbar, cameras and access control
  • Fire detection and data systems
  • UPS/generator, seismic protection and explosion-proof electrical works

Source: Birsoy Mühendislik 2022 catalogue portfolio, p. 13. The project information here reflects the catalogue period.

PROJECT PROGRESS

Step by step
through to handover.

Completed

Stage 5 / 5 · Handover

Last update: 19 October 2026

Overall progress100%

Work packages

Engineering and design100%
Procurement100%
Cabling and wiring100%
Switchgear and transformer installation100%
Testing and commissioning100%
  1. Survey and designcompleted
  2. Approvals and procurementcompleted
  3. Site installationcompleted
  4. Testing and commissioningcompleted
  5. Handovercompleted