Sima Alüminyum
Transformer and electrical systems at the new factory in İMES OSB.

PROJECT DETAILS
- Client
- Sima Dış Tic. Alüminyum San. A.Ş.
- Sector
- Industrial
- Status
- Completed
- Transformer capacity
- 3 × 1600 kVA
- Location
- İMES OSB
ABOUT THE PROJECTTailored to the need,
Tailored to the need,
proven on site.
A scope of work for a new factory, ranging from a medium voltage transformer substation to low-current systems.
Scope of work
- MV transformer substation and power transmission line
- LV installation and busbar assembly
- Access control, cameras and data
- Lightning protection, indoor and outdoor lighting
Source: Birsoy Mühendislik 2022 catalogue portfolio, p. 12. The project information here reflects the catalogue period.
PROJECT PROGRESS
Step by step
Step by step
through to handover.
Completed
Last update: 19 October 2026
Work packages
- Survey and designcompleted
- Approvals and procurementcompleted
- Site installationcompleted
- Testing and commissioningcompleted
- Handovercompleted